G81 Resource Library

At Aurora we’ve reimagined the G81 delivery process, which defines the technical specifications of equipment you need to use. This gives you more choice, while speeding up delivery and reducing costs.

In the coming months, we’ll be making things even more flexible by releasing voltage specific G81s. Click the sections below to check their availability. 

Appendix to ENA Engineering Recommendation G81 Part 1 & 4 New Electricity Connection or Modification of an Existing Connection Application.

Document

Appendix to ENA Engineering Recommendation G81 Part 2 & 5 Material Specification October

Document

Appendix to ENA Engineering Recommendation G81 Part 3 & 6 Installation records for housing developments and I&C installation

Document

General Design Requirements for LV Network

Document

Coming soon

Cables, Joints and Terminations for LV Network

Document

Coming soon

Switchgear and Protection for LV Network

Document

Coming soon

Appendix to ENA Engineering Recommendation G81 Part 1 & 4 New Electricity Connection or Modification of an Existing Connection Application.

Document

Appendix to ENA Engineering Recommendation G81 Part 2 & 5 Material Specification October

Document

Appendix to ENA Engineering Recommendation G81 Part 3 & 6 Installation records for housing developments and I&C installation

Document

General Design Requirements for HV Network

Document

Coming soon

Cables, Joints and Terminations for HV Network

Document

Coming soon

Switchgear and Protection for HV Network

Document

Coming soon

Substation and Transformer for HV Network

Document

Coming soon

Appendix to ENA Engineering Recommendation G81 Part 1 & 4 New Electricity Connection or Modification of an Existing Connection Application.

Document

Appendix to ENA Engineering Recommendation G81 Part 2 & 5 Material Specification October

Document

Appendix to ENA Engineering Recommendation G81 Part 3 & 6 Installation records for housing developments and I&C installation

Document

General Design Requirements for EHV Network

Document

Coming soon

Cables, Joints and Terminations for EHV Network

Document

Coming soon

Switchgear and Protection for EHV Network

Document

Coming soon

Substation and Transformer for EHV Network

Document

Coming soon

Appendix to ENA Engineering Recommendation G81 Part 1 & 4 New Electricity Connection or Modification of an Existing Connection Application.

Document

Appendix to ENA Engineering Recommendation G81 Part 2 & 5 Material Specification October

Document

Appendix to ENA Engineering Recommendation G81 Part 3 & 6 Installation records for housing developments and I&C installation

Document

General Design Requirements for 132kV Network

Document

Coming soon

Cables, Joints and Terminations for 132kV Network

Document

Coming soon

Switchgear and Protection for 132kV Network

Document

Coming soon

Substation and Transformer for 132kV Network

Document

Coming soon

Appendix to ENA Engineering Recommendation G81 Part 1 & 4 New Electricity Connection or Modification of an Existing Connection Application.

Document

Appendix to ENA Engineering Recommendation G81 Part 2 & 5 Material Specification October

Document

Appendix to ENA Engineering Recommendation G81 Part 3 & 6 Installation records for housing developments and I&C installation

Document

Installation, Testing and Commissioning Requirements

Document

Coming soon

BNO and Multi Occupancy Guidance

Document

Coming soon

SCADA and Control Requirements

Document

Coming soon

Modification on Existing Connection Application

Document

Coming soon